Strategic Plan
In 2010, MMMWC adopted a 10-year strategic plan, which the Board reviews
quarterly. To review a copy, click here.
Short Term Goals:
1.
Complete transition to metering
2.
Engineer plan for and implement chlorination
3.
Complete engineering analysis on alternative locations for transmission line
4.
Pursue grant and/or subsidized loan for transmission line upgrade
5.
Continue upgrade of transmission line either at existing or a new location
6.
Map, inventory, and GIS MMWC’s pipelines and other infrastructure assets
7.
Analyze and create a plan for replacement and/or upgrade of aging assets